|
|
|
|
LEADER |
00000nam a2200000 a 4500 |
001 |
115609 |
003 |
Ucuenca |
005 |
20230308191115.0 |
008 |
016062|2011 ||||||||r|||||||||||spa|| |
999 |
|
|
|c 75075
|d 75075
|
020 |
|
|
|a 9780470630013
|
040 |
|
|
|b spa
|a UCuenca-cdrjbv
|c UCuenca
|e rda
|
041 |
0 |
|
|a spa
|
082 |
0 |
|
|a 621.315
|
100 |
1 |
|
|a Li, Wenyuan.
|d 1946-
|9 126404
|e autor
|
245 |
|
|
|a Probabilistic transmission system planning
|c Wenyuan Li, Fellow, IEEE, EIC Bc Hydro, Canada
|
264 |
|
1 |
|a New Jersey:
|b Wiley,
|c 2011.
|
300 |
|
|
|a 352 páginas:
|b tab
|c 24 cm
|
336 |
|
|
|2 rdacontent
|a texto
|b txt
|
337 |
|
|
|2 rdamedia
|a no mediado
|b n
|
338 |
|
|
|2 rdacarrier
|a volumen
|b nc
|
504 |
|
|
|a incl. ref.
|
505 |
|
|
|a 1. Introduction. -- 1.1 Overview of Transmission Planning. -- 1.2 Necessity of Probabilistic Transmission Planning. -- 1.3 Outline of the book. -- 2. Basic Concepts of Probabilistic Planning. -- 2.1 Introduction. -- 2.2 Probabilistic Planning Criteria. -- 2.3 Procedure of Probabilistic Planning. -- 2.4 Other Aspects in Probabilistic Planning. -- 2.5 Conclusions. -- 3. Loading Modeling. -- 3.1 Introduction. -- 3.2 Load Forecast. -- 3.3 Load Clustering. -- 3.4 Uncertainty and Correlation of Bus Loads. -- 3.5 Voltage- and Frequency-Dependent Bus Loads. -- 3.6 Conclusions. -- 4. System Analysis Techniques. -- 4.1 Introduction. -- 4.2 Power Flow. -- 4.3 Probabilistic Power Flow. -- 4.4 Optimal Power Flow (OPF). -- 4.5 Probabilistic Search Optimization Algorithms. -- 4.6 Contingency Analysis and Ranking. -- 4.7 Voltage Stability Evaluation. -- 4.8 Transient Stability Solution. -- 4.9 Conclusions. -- 5. ProbabilisticReliability Evaluation. -- 5.1 Introduction. -- 5.2 Reliability Indices. -- 5.3 Reliability Worth Assessment. -- 5.4 Substation Adequacy Evaluation. -- 5.5 Composite System Adequacy Evaluation. -- 5.6 Probabilistic Voltage Stability Assessment. -- 5.7 Probabilistic Transient Stability Assessment. -- 5.8 Conclusions. -- 6. Economic Analysis Methods. -- 6.1 Introduction. -- 6.2 Cost Components of Projects. -- 6.3 Time Value of Money and Present Value Method. -- 6.4 Depreciation. -- 6.5 Economic Assessment of Investment Projects. -- 6.6 Economic Assessment of Equipment Replacement. -- 6.7 Uncertainty Analysis in Economic Assessment. -- 6.8 Conclusions. -- 7. Data in Probabilistic Transmission Planning. -- 7.1 Introduction. -- 7.2 Data for Power System Analysis. -- 7.3 Reliability Data in Probabilistic Planning. -- 7.4 Other Data. -- 7.5 Conclusions. -- 8. Fuzzy Techniques for Data Uncertainty. -- 8.1 Introduction. -- 8.2 Fuzzy Models of Systems Component Outages. -- 8.3 Mixed Fuzzy and Probabilistic Models for Loads. -- 8.4 Combined Probabilistic and Fuzzy Techniques. -- 8.5 Example 1: Case Study Not Considering Weather Effects. -- 8.6 Example 2: Case Study Considering Weather Effects. -- 8.7 Conclusions. -- 9. Network Reinforcement Planning. -- 9.1 Introduction. -- 9.2 Probabilistic Planning of Bulk Power Supply System. -- 9.3 Probabilistic Planning of Transmission Loop Network. -- 9.4 Conclusions. -- 10. Retirement Planning of Network Components. -- 10.1 Introduction. -- 10.2 Retirement Timing of an Aged AC Cable. -- 10.3 Replacement Strategy of an HVDC Cable. -- 10.4 Conclusions. -- 11. Substation Planning. -- 11.1 Introduction. -- 11.2 Probabilistic Planning of Substation Configuration. -- 11.3 Transformer Spare Planning. -- 11.4 Conclusions. -- 12. Single Circuit Supply System Planning. -- 12.1 Introduction. -- 12.2 Reliability Performance of Single Circuit Supply Systems. -- 12.3 Planning Method of Single Circuit Supply Systems. -- 12.4 Application to Actual Utility System. -- 12.5 Conclusions. -- Appendix A. Elements of Probability Theory and Statistics. -- Appendix B. Elements of Fuzzy Mathematics. -- Appendix C. Elements of Reliability Evaluation.
|
650 |
|
|
|a Trasmision
|9 126405
|
650 |
|
0 |
|a Energía eléctrica
|9 12455
|
650 |
|
0 |
|a Planificación
|9 825
|
852 |
|
|
|a UC-CDJBV
|f Compra
|l 1
|m General
|p 20160629
|q 200.00
|r 2
|t 115609
|v ing
|y 8349723
|b 0
|d CDRC
|e CDRC
|g 621.315 SEGUNDO PISO
|z 2016-60-62
|
856 |
|
|
|a http://sibuc.ucuenca.edu.ec/portada/115609-cdj.jpg
|
942 |
|
|
|c BK
|2 ddc
|